Skip to content

Prepaid meter installation

We install and connect prepaid sub-meters, single and three phase, so a cottage, tenant, shop or unit pays for its own electricity.

A prepaid electricity meter with a keypad mounted beside a small distribution board in a garage

Common reasons to fit one

  • Separate electricity for a cottage, granny flat or backyard room
  • Tenants in a house, block or centre who each buy their own units
  • A shop or workshop that shares a supply
  • Replacing a faulty or damaged sub-meter

What we do

Single phase

For cottages, flats and most homes.

Three phase

For larger homes, shops and workshops.

Sub-metering

A separate meter per tenant or unit, so each pays for what they use.

Testing

The new circuit is tested after installation, and a CoC can be issued for the work.

How we work, explained

An open three-phase distribution board with its cover fitted, showing the main switch, surge arrester, earth leakage unit and rows of circuit breakers
Distribution boardsA board you can read at a glanceMain switch, surge protection, earth leakage and every circuit on its own breaker, in neat rows behind a fitted cover. Safer for you, and quicker to work on next time.
An electrician holding an insulation tester with coiled test leads beside a closed distribution board in an empty, sunlit home
Certificates of ComplianceInspected and tested before we signA CoC confirms the installation meets SANS 10142-1. We inspect and test, fix anything that fails, and only then issue the certificate.
New conduit chased into a plastered wall, with empty socket boxes being set level before the wiring goes in
RewiringNew wiring, room by roomConduit and boxes go in first, then new conductors with an earth on every circuit. Every circuit is tested and signed off with a CoC.

Pictures are illustrations of the work described.

How long it takes

Most single meter installations take a few hours. Several units on one site are quoted together.

Included

  • Installation and connection of the meter
  • Testing of the new circuit

Not included

  • Long cable runs or trenching, which are quoted
  • A CoC, unless booked with the work

Call-out rates

A booked visit is for a fault that can wait: we confirm the date and time with you. An emergency call-out gets priority, day or night. Both are booked with a 50% deposit online.

Call-out rates for booked visits and emergencies
TimeBooked visitEmergency call-out
Day07:00 – 18:00R750R2,500
Night18:00 – 07:00R1,200R3,500

Questions

How much does a prepaid meter installation cost?

It depends on single or three phase, the cable runs and where the meter goes. For current prices, ask our intelligent WhatsApp agent.

Can you replace my municipal meter?

No. The municipal or Eskom meter belongs to the supplier, so faults on it must be reported to them. We install and maintain prepaid sub-meters on your side of the supply.

Should tenants have separate meters?

It's the fairest way to split electricity costs. With a sub-meter per unit, every tenant buys their own units.

We cover Johannesburg, Sandton, Randburg, Roodepoort, Soweto, Midrand, Centurion, Pretoria, East Rand (Ekurhuleni), West Rand. Areas we cover

WhatsAppBook a call-outEmergency