Electrical Certificate of Compliance (CoC)

A Certificate of Compliance (CoC) is the electrical safety certificate. It confirms that your installation meets SANS 10142-1, the South African wiring standard. You need a valid one to sell a property and after new electrical work. We inspect, test, fix anything that fails and issue the certificate.

An electrician holding an insulation tester with coiled test leads beside a closed distribution board in an empty, sunlit home

When you need a CoC

  • You are selling a house, flat or business premises
  • New electrical work has been done, like a new circuit or DB board
  • Your existing CoC is more than two years old and the property is being transferred
  • An insurer or landlord has asked for one

What we do

Inspection

The DB board, wiring, plugs, lights, earthing and fixed appliances are inspected.

Testing

Insulation resistance, earth continuity, earth leakage trip times and polarity are tested and recorded.

Remedial work

If something fails, we tell you what and quote the fix before doing it.

The certificate

Once the installation passes, we issue the CoC with the test report.

How we work, explained

An open three-phase distribution board with its cover fitted, showing the main switch, surge arrester, earth leakage unit and rows of circuit breakers
Distribution boardsA board you can read at a glanceMain switch, surge protection, earth leakage and every circuit on its own breaker, in neat rows behind a fitted cover. Safer for you, and quicker to work on next time.
New conduit chased into a plastered wall, with empty socket boxes being set level before the wiring goes in
RewiringNew wiring, room by roomConduit and boxes go in first, then new conductors with an earth on every circuit. Every circuit is tested and signed off with a CoC.
A prepaid electricity meter with a keypad mounted beside a small distribution board in a garage
Prepaid metersA prepaid meter for a cottage or tenantWe install and connect single and three-phase prepaid sub-meters, test the new circuit, and a CoC can be issued for the work.

Pictures are illustrations of the work described.

How it works

  1. 1Book a day slot or a rush CoC online with a 50% deposit.
  2. 2We inspect and test the whole installation.
  3. 3If it passes, you get the CoC. If not, you get a list of faults and a price to fix them.
  4. 4Once the repairs are done, we retest and issue the certificate.

How long it takes

A standard house takes a few hours to inspect and test. Properties with more than one DB board take longer.

Included

  • Full inspection and testing
  • A written test report
  • The CoC once the installation passes

Not included

  • Remedial work, which is quoted before we do it
  • Electric fences, which need their own certificate

Call-out rates

A booked visit is for a fault that can wait: we confirm the date and time with you. An emergency call-out gets priority, day or night. Both are booked with a 50% deposit online.

Call-out rates for booked visits and emergencies
TimeBooked visitEmergency call-out
Day07:00 – 18:00R750R2,500
Night18:00 – 07:00R1,200R3,500

Questions

How much is an electrical CoC?

It depends on the property, how many DB boards it has and how soon you need it. For current CoC prices, including rush CoCs and CoCs with remedial work, ask our intelligent WhatsApp agent.

How long is a CoC valid for?

It stays valid as long as the installation isn't changed, but for a property transfer a certificate older than two years is generally not accepted.

What happens if my property fails?

You get a list of what failed and a price to fix it. Once the repairs are done, we retest and issue the certificate.

Do you issue CoCs for businesses?

Yes, for shops, offices and other commercial premises. Larger sites with several boards are quoted.